Soakaway tank installation — excavation, tank placement and backfill — for villa drainage systems.
Soakaway installation needs an excavation sized precisely to the tank and its surround material — too loose a fit wastes material and backfill time, too tight risks damaging the tank on installation.
A soakaway that's backfilled incorrectly won't drain as designed. We follow the specified bedding and surround material rather than substituting whatever's on hand.
We handle the excavation, bedding, tank placement coordination and backfill as one job.
It depends on the tank size and drainage design; we dig to the exact specification provided by your drainage consultant.
| Office Address | Greece Bldg, L-09, Warsan First, Dubai, UAE |
|---|---|
| Working Hours | Mon – Sun: 9:00 AM – 9:00 PM (GMT+4, Dubai) |
| Phone / WhatsApp | +971 50 699 5027 |
| project@buildorag.ae |